Crude Oil Price by oil-price.net

Oil and Gas Energy News Update

Showing posts with label Parker. Show all posts
Showing posts with label Parker. Show all posts

Thursday, June 16, 2011

Parker EPD Unveils Subsea Metrology Systems in GOM

- Parker EPD Unveils Subsea Metrology Systems in GOM

Thursday, June 16, 2011
Parker Hannifin Corp.

Parker Energy Products Division (EPD), a division of Parker Hannifin Corporation, is introducing their subsea metrology and dimensional control services to the Gulf of Mexico oil and gas market.

EPD has demonstrated their success with photogrammetry, surveying and position monitoring services in Northern Europe and Asia Pacific. Recently the division has added technical staff in Houston, Texas to support the metrology service expansion to the Gulf of Mexico.

The first subsea metrology system Parker will utilize in this market is SICAMS®; a single camera metrology system used to obtain accurate subsea measurements (centerline distances, diameters, pitch and roll) of existing structures. With SICAMS®, data can be gathered simply, efficiently, and precisely. Unlike other metrology systems, SICAMS® is revolutionary because it does not require acoustics or a full survey crew. Achieving an accuracy of 1 part in 5,000 is routine with Parker's system, though higher accuracies have been measured. Its state-of-the-art processing capability promises quick calculation and deliverables on-site.

Kristoffer Amdal, Parker EPD's Maritime Business Unit Manager, said, "We are confident that the Gulf of Mexico market will benefit from our metrology services. Accurate dimensional information delivered this fast will definitely prove to be a valuable asset to whatever project our clients need measured, whether it be planning a tooling interface, designing a salvage lift, analyzing physical damage, or even designing retro-fit supports."

The metrology system operates by using multiple photos from many angles to produce an accurate 3D model of the object being measured. In addition, there is a reporting tool built into the processing software which allows for a clearer image to be produced and utilized, therefore providing a more reliable 3D model.

Oil & Gas Post

Promote Your Page Too

Wednesday, June 15, 2011

Parker Hannifin Awarded Mooring Contract by Subsea 7

- Parker Hannifin Awarded Mooring Contract by Subsea 7

Wednesday, June 15, 2011
Parker Hannifin Corp.

The Energy Products Division of Parker Hannifin Corporation has been awarded a contract from Subsea 7 for one of the world's largest mooring projects. Parker will supply the steel wire tether system for the deep water Guara and Lula NE submerged buoys in Brazil. Subsea 7 has been contracted by Petrobras to provide engineering, procurement, installation and pre-commissioning of four decoupled riser systems in this field.

Parker will provide Subsea 7 with 34 sheathed tethering lines each measuring more than 6,000 feet (over 1850 meters) in length. These steel tethers will keep the submerged buoys securely moored to the seabed of the Guara and Lula NE fields. The mooring lines will be engineered and constructed at the Tønsberg, Norway manufacturing location.

EPD's General Manager, Craig Anderson, stated, "We are proud to have been selected to provide our mooring products for the Guara and Lula NE development, and we look forward to partnering with the Subsea 7 project team on this world-class project."

Oil & Gas Post

Promote Your Page Too