Crude Oil Price by oil-price.net

Oil and Gas Energy News Update

Showing posts with label located. Show all posts
Showing posts with label located. Show all posts

Thursday, March 31, 2011

TGS Commences Reprocessing Program Offshore Indonesia

TGS Commences Reprocessing Program Offshore Indonesia

Thursday, March 31, 2011
TGS-NOPEC Geophysical Co. ASA
TGS has commenced an extensive multi-phase reprocessing program of 2D seismic data located in the Makassar Strait, Indonesia. The first phase consists of 2,700 km of seismic data in the Northern Mahakam Delta.

The original and reprocessed data support the exploration potential of the deepwater area of the Mahakam Delta. Interpretation of the seismic data since 2001 has demonstrated potential hydrocarbon prospectivity in the basin, resulting in the award of exploration acreage and the drilling of several exploration wells. Partial relinquishment of the exploration blocks have also recently created opportunities for new exploration in the area.

The data will be reprocessed with customized techniques to enhance imaging of the main structures and reservoir targets in the basin. The reprocessed data is intended to enhance definition of Direct Hydrocarbon Indicators (DHIs) and Amplitude Versus Offset (AVO) anomalies associated with turbidite reservoirs seen on the original 2D seismic data.

Data from this initial phase of reprocessing will be available for clients in 3Q 2011. This project is supported by industry funding.

Wednesday, March 23, 2011

Shell Fires Up Gas Production Offshore Qatar

Wednesday, March 23, 2011
Royal Dutch Shell
 
Qatar Petroleum and Shell announced the first flow of dedicated offshore gas into the Pearl GTL plant located in Ras Laffan Industrial City in the State of Qatar.

Shell, which is the operator of the Pearl GTL plant developed under a Production and Sharing Agreement with QP, has opened natural gas wells offshore allowing the first sour gas to flow through a subsea pipeline into the giant GTL plant onshore. Sections of the Pearl GTL plant will be started up progressively over the coming months.

The Pearl GTL project was launched in July 2006 and the first stone was laid by His Highness Sheikh Tamim bin Hamad Al-Thani, the Heir Apparent in February 2007.

Pearl GTL is the largest energy project ever launched in the State of Qatar, in terms of total investments. It consists of two offshore platforms 60 kilometers off the Qatar coast, connected by pipeline to the largest Gas to Liquids plant ever built, located in Ras Laffan Industrial City.

His Excellency Dr. Mohammed bin Saleh Al-Sada, Qatar's Minister of Energy and Industry said, "This project will play an important role in further enhancing our diversification of the North Field gas utilization and will support the optimization of Qatar’s competitive position in the world markets by supplying ultra clean GTL products. I would like to congratulate the Qatar Petroleum and Shell teams on first on-shore gas. The scale, technology and safety record on Pearl GTL have broken all records. This is a proud day for the State of Qatar, for Qatar Petroleum and for our partner Shell."

Peter Voser, Chief Executive Officer of Royal Dutch Shell said, "Today is an important milestone in the Pearl GTL project, and we are on a clear pathway towards the start up of gas to liquids production. I would like to thank Qatar Petroleum and the State of Qatar for their support throughout, to make such a substantial project possible."

Once fully operational, Pearl will produce 1.6 billion cubic feet of gas per day from the North Field, which will be processed to generate 120,000 barrels per day of condensate and natural gas liquids and 140,000 barrels per day of gas to liquids (GTL) products. Gas-to-liquids products are high quality, clean-burning oil products such as gasoil, high specification lubricants base oils, and chemicals feedstock.

Link