Tuesday, June 14, 2011
Beach Energy Ltd.
Beach advised that the flow stimulation of Holdfast-1 commenced over the weekend.
This is the first time flow stimulation has specifically targeted shale target zones at depth in the Cooper Basin, with the flow stimulation of Holdfast-1 to be undertaken in eight stages.
It is expected that the stimulation process will be completed within two weeks, after which the flow testing will commence (early July).
Participants in PEL 218 (Permian JV) are:
- Beach (Operator) 90%
- Adelaide Energy Ltd 10%
Oil & Gas Post
Promote Your Page Too
No comments:
Post a Comment