Crude Oil Price by oil-price.net

Oil and Gas Energy News Update

Showing posts with label Lula. Show all posts
Showing posts with label Lula. Show all posts

Friday, July 8, 2011

Petrobras Confirms Commercial Potential of Lula Well

- Petrobras Confirms Commercial Potential of Lula Well

Friday, July 08, 2011
Petrobras
by SubseaIQ

Petrobras announced that well 9-RJS-660, located in Lula field, registered the Company's highest volume of production for May, reaching an average production of 28,436 barrels of oil per day (bpd). This well is the first to produce on a commercial basis in the Santos Basin pre-salt.

This result confirms the high potential of Brazil's pre-salt reservoirs, and, if we consider oil and natural gas production, the volume reached 36,322 barrels of oil equivalent per day (boed).

The well is interconnected to FPSO Cidade de Angra dos Reis and is the first of six production wells to be connected to the FPSO. Besides this well, a gas injection well is already connected to the platform, which, since the beginning of April 2011, reinjects produced gas into the reservoir through 9-RJS-660. Two injection wells are also planned, of which one will be of water, and the other will alternate injection of water and gas.

The FPSO Cidade de Angra dos Reis is expected to be producing around 100 thousand bpd throughout 2012.

The consortium developing the production in block BMS-11, where Lula field is located, is composed of Petrobras, which is the operator, with a 65% stake, BG Group, with 25%, and Galp Energia, with 10%.

Oil & Gas Post

Promote Your Page Too
LINK

Thursday, April 28, 2011

Petrobras Begins Lula Nordeste EWT

Petrobras Begins Lula Nordeste EWT

Thursday, April 28, 2011
Petrobras

Petrobras has started the Extended Well Test (EWT) in the northeastern area of Lula Field, in the Santos Basin pre-salt, approximately 300 kilometers off the coast of Rio de Janeiro.

The EWT is taking place in the FPSO BW Cidade de São Vicente, anchored at a depth of 2,120 meters. Production should remain at around 14 thousand barrels of oil per day.

The information obtained in the test of Lula Nordeste will aid studies for the development of the project of the second definitive production system to be installed in the Lula field, called Lula Nordeste Pilot, through FPSO Cidade de Paraty.

The EWT of Lula Nordeste is a project of the consortium formed by Petrobras (operator, with 65% interest), BG Group (25%) and Galp Energia (10%).