Crude Oil Price by oil-price.net

Oil and Gas Energy News Update

Showing posts with label N.Oklahoma. Show all posts
Showing posts with label N.Oklahoma. Show all posts

Tuesday, June 14, 2011

Well Completion Prog. Underway at American Petro-Hunter's N. Oklahoma Proj.

- Well Completion Prog. Underway at American Petro-Hunter's N. Oklahoma Proj.

Tuesday, June 14, 2011
American Petro-Hunter Inc.

American Petro-Hunter advised that the well completion program is fully underway and that production testing of the Mississippi oil formation is currently ongoing at the recently drilled NOM1H Horizontal well at the Company's growing North Oklahoma Project. The well is being readied and prepared for the onset of commercial production.

The completion phase of the well, including swab and production testing, is being undertaken in combination with the immediate installation of long term production facilities including a pumping unit, tank battery, ancillary metering and electrical equipment on the lease. The determination to rapidly move forward and complete the production facilities was based on a confident expectation that the Company will be generating oil sales from the lease near the end of June or early July.

A decision to move ahead with a full completion program was initiated when NOM1H reached the engineered T.D. of the 1,600 foot horizontal leg with excellent oil and gas shows encountered in the form of strong oil fluorescence; gassy oil shows and gas kicks along the drilled lateral. Subsequent results have offered continued favorably trending data, and as such, have reinforced the Company's expectations for viable commercial production at the lease.

The NOM1H well is the first of a planned series of horizontal wells designed to test and develop oil and gas in the 100 foot thick limestone Mississippi Formation.

Oil & Gas Post

Promote Your Page Too

Monday, June 6, 2011

American Petro-Hunter: Production Testing Underway at N. Oklahoma Proj.

- American Petro-Hunter: Production Testing Underway at N. Oklahoma Proj.

Monday, June 06, 2011
American Petro-Hunter Inc.

American Petro-Hunter reported that the recently completed NOS122 well is undergoing production testing and appears to be a strong producer and is outperforming expectations to date.

The NOS122 well is located at the Company's North Oklahoma Project. The production test and evaluation phase has been ongoing over the past few weeks with high gravity light oil produced to the storage tank from a 6 foot pay zone. The oil cut has been steadily over 90% with some associated gas. The well has been producing oil at rates in a broad range generally between 50 and 70 barrels per day.

Although a stable daily production rate hasn't yet been established, the Company has been informed by the operator that the pay zone would benefit from a light fracture stimulation which would in all likelihood allow a significant increase in daily rates. The partners are now preparing a simple fracking plan that will be implemented in the upcoming days.

The establishment of a full tank battery and ancillary production facilities is in the final stages of construction on the lease. Currently, oil in the onsite storage tank is being prepared for sale to the local purchaser and inaugural sales are expected shortly. As reported earlier, the partners have identified a minimum of 3 additional offsets to the NOS122 for future development.

Company President Robert McIntosh stated, "We are very pleased at the early test results at NOS122 and to be producing oil at levels that have exceeded our expectations. The plan to stimulate the reservoir and bring on even more oil, as well as our intent to drill additional wells very shortly, is rapidly moving this leasehold into becoming a key component of our growing production portfolio."

American Petro-Hunter has a 50% working interest in the NOS122 and oil is sold to Sunoco, the regional purchaser.

Oil & Gas Post

Promote Your Page Too