Crude Oil Price by oil-price.net

Oil and Gas Energy News Update

Wednesday, August 31, 2011

Texon Runs Production Tests at 2nd Eagle Ford Well

- Texon Runs Production Tests at 2nd Eagle Ford Well

Wednesday, August 31, 2011
Global Petroleum Ltd.

Texon has advised that the second Eagle Ford well in which Global has an interest (Tyler Ranch EFS #2H) has tested oil and gas at the rates of 1,488 bopd and 700 mcfgpd (combined 1,605 boepd) through a 16/64" choke at a flowing tubing pressure of 3,000 psi.

The well is located just to the north of the first Eagle Ford well (Tyler Ranch EFS #1H) which had an initial test rate of 1,200 bopd through the same sized choke. Tyler Ranch EFS #2H also has a higher flowing pressure than the first Eagle Ford well. The second Eagle Ford well has been connected for oil and gas production through the EFS #1H production facilities.

Global has a 7.939% working interest (5.95% NRI) in approximately 1,651 acres beneath the Olmos formation including the Eagle Ford Shale. Global's interest in the Leighton prospect also includes a 15% working interest in approximately 873 acres from the surface down to the stratigraphic equivalent of the Olmos formation.

Oil & Gas Post

Promote Your Page Too
LINK

No comments:

Post a Comment