- Petro Matad Begins Drilling at Davsan Tolgoi-9 Well
Thursday, August 04, 2011
Petro Matad Ltd.
Petro Matad announced that the Davsan Tolgoi-9 ("DT-9") exploration well was spudded at 8.50 p.m. Mongolian time (1.50 p.m. BST) on August 3, 2011.
The DT-9 well is being drilled vertically to an estimated target depth of 1,750 meters. The well is being drilled by the Company's contractor, DQE International.
DT-9 targets the Lower Tsagaantsav reservoir at a location 2.5 km south of and 220 meters high to the Company's DT-4 well, which recovered oil-saturated core from the Lower Tsagaantsav.
Oil & Gas Post
Promote Your Page Too
LINK
No comments:
Post a Comment