Crude Oil Price by oil-price.net

Oil and Gas Energy News Update

Wednesday, August 10, 2011

Oilex Preps for Flow Back at Cambay Well

- Oilex Preps for Flow Back at Cambay Well

Wednesday, August 10, 2011
Oilex Ltd.

Oilex advised that all eight stages of the fracture stimulation program of the horizontal section in the Cambay-76H well were pumped successfully and according to plan.

The well is currently being prepared for flow to surface to remove stimulation fluids from the formation (well clean-up phase). After the completion of the clean-up operations a flow test will be conducted.

The Cambay-76H "proof of concept" horizontal well is evaluating the production potential of the Y Zone interval of the extensive deep Eocene "tight" reservoirs in the onshore Cambay Production Sharing Contract area, Gujarat, India.
  • Report date: August 9, 2011
  • Status: Prepare for flow back and clean-up operations
  • Past Week's Operations:
    • Completed eight stage fracture stimulation program
    • Completed micro-seismic and pressure data acquisition
    • Preparations for well clean-up operations
  • Objective: Cambay Eocene "tight" reservoir Y Zone
  • Total Depth: 2,740 meters including 610 meters horizontal section

The participating interests in the Cambay PSC are:
  • Oilex Ltd (Operator) 30%
  • Oilex NL Holdings (India) Limited 15%
  • Gujarat State Petroleum Corporation Ltd 55%

Oil & Gas Post

Promote Your Page Too
LINK

No comments:

Post a Comment