- Entek Preps VR 342 Well for Casing in GOM
Thursday, May 19, 2011
Entek Energy Ltd.
Entek provided an update on the VR 342 well in the Gulf of Mexico.
The well is at 5,145' (Measured Depth). Current operations involve finalization of running the 13 3/8'' casing and testing surface equipment before drilling ahead. The next casing point is planned to be around 7,500' where 9 5/8" casing will be set. The planned total depth of the well is 8,552' (Measured Depth).
Oil & Gas Post
Promote Your Page Too
No comments:
Post a Comment