Crude Oil Price by oil-price.net

Oil and Gas Energy News Update

Tuesday, May 31, 2011

Aker to Supply Subsea Production Control Umilicals for Chevron

- Aker to Supply Subsea Production Control Umilicals for Chevron

Tuesday, May 31, 2011
Aker Solutions

Aker Solutions has been selected to supply three subsea production control umbilicals for the Chevron operated Jack & St. Malo field developments in the Gulf of Mexico. Contract value is undisclosed.

The production control umbilicals will provide hydraulic, electrical and fiber optic service to the Jack and St. Malo subsea fields. Scope of work includes three electro-hydraulic steel tube production umbilicals totaling 40 miles (65 kilometers). Engineering, project management, and manufacturing will take place at Aker Solutions' state-of-the-art umbilical facility in Mobile, Alabama. The three umbilicals will be used at Chevron's Jack & St. Malo field, located in the Walker Ridge Area of the Gulf of Mexico in water depths of approximately 7,000 feet (2,100 meters).

"Aker Solutions is excited to see Chevron come back to us with a repeat order and is proud to contribute to this very important project for Chevron and for the Gulf of Mexico region," said Erik Wiik, President - Subsea North America, Aker Solutions.

Oil & Gas Post

Promote Your Page Too

No comments:

Post a Comment