Crude Oil Price by oil-price.net

Oil and Gas Energy News Update

Wednesday, August 24, 2011

Oilex Continues Preps for Production Testing at Cambay Well

- Oilex Continues Preps for Production Testing at Cambay Well

Wednesday, August 24, 2011
Oilex Ltd.

Oilex advised that operations to prepare for well clean-up flow and production testing are continuing. Some delays have been experienced during coil tubing unit interventions to open up the remaining fracture stimulation stages.

After clean-up operations a flow test will be conducted.

The Cambay-76H "proof of concept" horizontal well is evaluating the production mpotential of the Y Zone interval of the extensive deep Eocene "tight" reservoirs in the onshore Cambay Production Sharing Contract area, Gujarat, India.
  • Report date: August 23, 2011
  • Status: Opening up fracture stimulation stages
  • Past Week's Operations:
    • Retrieving milling tools in well
    • Run milling tools in well
    • Repairs to coil tubing unit
    • Initial flow-back of hydrocarbons and stimulation fluids from first fracture stimulation stage
  • Objective: Cambay Eocene "tight" reservoir Y Zone
  • Total Depth: 2,740 meters including 610 meters horizontal section

The participating interests in the Cambay PSC are:
  • Oilex Ltd (Operator) 30%
  • Oilex NL Holdings (India) Limited 15%
  • Gujarat State Petroleum Corporation Ltd 55%

Oil & Gas Post

Promote Your Page Too
LINK

Testing Begins at Global's 2nd Eagle Ford Well

- Testing Begins at Global's 2nd Eagle Ford Well

Wednesday, August 24, 2011
Global Petroleum Ltd.

Texon has advised that the second Eagle Ford well in which Global has an interest (Tyler Ranch EFS #2H) has been successfully fracked over 17 stages and will now be tested. The recovery of frac fluid will probably take a few days after which Texon will conduct a proper flow test of the well.

Global has a 7.939% working interest in approximately 1,651 acres beneath the Olmos formation including the Eagle Ford Shale. Global's interest in the Leighton prospect also includes a 15% working interest in approximately 873 acres from the surface down to the stratigraphic equivalent of the Olmos formation.

Oil & Gas Post

Promote Your Page Too
LINK

CNOOC Sees 51% Increase in YOY Profit

- CNOOC Sees 51% Increase in YOY Profit

Wednesday, August 24, 2011
CNOOC Ltd.

CNOOC announced its interim results as of June 30, 2011.

The Company's total net oil and gas production amounted to 168.7 million barrels of oil equivalent (BOE), representing an increase of 12.9% year-on-year (YOY). This is mainly attributed to: firstly, the new oilfields and development wells which continued to introduce new momentum to the Company's production; secondly, production contributions from newly acquired projects since 2010; and thirdly, the composite decline rate of producing oil and gas fields which has remained low through comprehensive adjustment measures.

Meanwhile, international oil prices fluctuated sharply, although generally, it sustained at a high level. Having benefited from this, the Company's realized oil price reached US $108.16/barrel, 40.8% higher than that of the same period last year. The Company's realized gas price was US $4.92/mcf, increasing 15.5% YOY.

Due to stable oil and gas production growth, as well as higher realized prices, the Company's oil and gas sales revenue for the first half of the year surged 45.0% YOY to RMB97.03 billion. Despite escalating prices of oilfield services and raw materials, the Company's production cost has remained at a low level mainly due to cost savings and efficiency enhancement. The seasonality factor has also lowered the production cost. During the first half of 2011, our operating cost was down 3.8% from 2010 average of US $7.28 to US $7.00 per barrel. The Company recorded net profit of RMB39.34 billion ($5.06B), representing a significant increase of 51.4% YOY.

In the area of exploration, the Company made 6 new discoveries and 18 successful appraisal wells. The first commercial discovery of Wushi 17-2 was made in Wushi Sag in the Western South China Sea. In terms of rolling exploration, two new discoveries Qinhuangdao 33-2 and Qinhuangdao 33-3 were made following the discovery of Qinhuangdao 33-1 South last year in the Shijiutuo uplift area.

Since the beginning of the year, the Company has further expanded its investments in shale oil and gas play and oil sands of North America, through the acquisition of a 33.3% interest in Chesapeake's Niobrara project and the acquisition of OPTI Canada Inc. In addition, we successfully acquired a one-third interest held by Tullow Oil in each of Exploration Areas 1, 2 and 3A in Uganda.

The Company has kept a good track record on health, safety and environmental protection (HSE) since established more than a decade ago. However, the oil spill incident of Penglai 19-3, an oilfield operated under production sharing contract in Bohai Bay, posed HSE challenges to the Company. This incident has made certain impact on the marine environment. Being a responsible energy company, we will continue to urge and assist ConocoPhillips China Inc., the operator of the Penglai 19-3 oilfield, to complete the cleanup work in a timely manner and to minimize the impact on the marine environment.

In addition, due to the combination of the progress of acquisition project and the impact from the oil spill incident, we reset the Company's annual production target at 331-341 million BOE.

Mr. Wang Yilin, Chairman of the Company said, "The outstanding results for the first half of 2011 demonstrated our operating and management capabilities. At the same time, we faced a challenge posed by the oil spill incident occurred at Penglai 19-3 oilfield and we felt deeply sorry about it. The Company has already started performing inspection on the major facilities, equipments and production operations of all our oilfields, and reinforcing our risk management measures, to avoid similar incidents happening in the future."

Mr. Yang Hua, Chief Executive Officer of the Company commented, "Since the beginning of the year, the Company has increased its investments in unconventional energy through the acquisition of shale oil and gas and oil sands projects, building an important resource base for the future. Year 2011 is a year of steady growth for the Company. In the second half of the year, the Company will continue to progress steadily to lay a solid foundation for the Company's long term development."

In the first half of the year, the Company's basic earnings per share reached RMB0.88. In order to share our outstanding results with shareholders, the board has declared an interim dividend of HK $ 0.25 per share (tax inclusive).

Oil & Gas Post

Promote Your Page Too
LINK

Tullow Touts Record Results in 1H11

- Tullow Touts Record Results in 1H11

Wednesday, August 24, 2011
Tullow Oil plc

Tullow announced its half-yearly results for the six months ended 30 June 2011.

2011 Half-yearly results summary
  • Record first half revenue and profit
  • Interim dividend doubled
  • Exploration success continues and developments being progressed

Tullow had a very strong first half. Record results were driven by increased production from the Jubilee field in Ghana and higher commodity prices. Exploration and appraisal success continued and the Group strengthened its portfolio with farm-ins in East Africa and two strategic acquisitions. Further progress was made in Uganda and Tullow now expects completion of its farm-down to CNOOC and Total in September. In July the Group listed Tullow Oil plc shares on the Ghana Stock Exchange.

Key highlights
  • Record sales revenue of over $1 billion driven by Jubilee Production; interim dividend doubled.
  • 71% exploration and appraisal success year-to-date (17/24); Akasa-1 discovery announced today.
  • Completion of farm-in to six blocks in Kenya and Ethiopia; first well to spud in Kenya in Q4 2011.
  • Group production expected to average 82-84,000 bopd for 2011 and exceed 100,000 bopd by year-end.
  • Jubilee production in Ghana is expected to increase to 105,000 bopd in October; plateau production of 120,000 bopd is now expected before year-end.
  • MoU signed with the Government of Uganda; $2.9 billion Sale and Purchase Agreements signed for the farm-down to CNOOC and Total; completion now expected in September.
  • Nuon E&P and EO Group acquisitions completed in June and July respectively.
  • Secondary listing on the Ghana Stock Exchange completed in July following successful $72.3 million offer.

Commenting, Aidan Heavey, Chief Executive, said, "We have delivered a strong performance and achieved record results in the first half allowing us to double the dividend. We continue to make good progress with production plans in both Ghana and Uganda and while delays to the farm-down to CNOOC and Total have been frustrating, we now expect completion in September. With a strong balance sheet, growing production and a potentially transformational drilling campaign to come, we move into the second half of the year with real confidence."

Oil & Gas Post

Promote Your Page Too
LINK