Crude Oil Price by oil-price.net

Oil and Gas Energy News Update

Showing posts with label Westall. Show all posts
Showing posts with label Westall. Show all posts

Monday, June 20, 2011

Cooper Plugs, Abandons Westall Well

- Cooper Plugs, Abandons Westall Well

Monday, June 20, 2011
Cooper Energy Ltd.

The Westall-1 exploration well has been drilled to a total depth of 1808 mRT and wireline logs have been run and interpreted.

During drilling there were no hydrocarbon shows observed in the primary objective (Namur Sandstone) or secondary objectives (Birkhead, Hutton and Poolowanna Formations) and the evaluation of the wireline logs has confirmed the absence of hydrocarbons in all objective horizons.

The Westall-1 well has been plugged and abandoned as dry hole, and the rig released on June 19, 2011.

The rig is currently moving to the Parsons-5 drill site as a development well.

Oil & Gas Post

Promote Your Page Too

Tuesday, June 14, 2011

Cooper Spuds Westall Well

- Cooper Spuds Westall Well

Tuesday, June 14, 2011
Cooper Energy Ltd.

Cooper announced that the Westall-1 exploration well in PEL92 spudded at 0700 hours Sunday, June 12, 2011. The surface hole has been drilled to 640 meters and the current operation is making preparations to run the 9⅝" casing.

The well's primary objective is the Namur Sandstone with secondary objectives in the Birkhead, Huttonand Poolowanna Formations. Westall-1 is located 2.8 km northwest of the Perlubie oil field and 3 km southwest of the Parsons oil field in South Australia's onshore Cooper basin. The well will be drilled to a total depth of about 1,765 meters and is expected to take about 8 days to drill and evaluate.

The primary objective Namur Sandstone, which is the oil reservoir in the nearby oil fields, is estimated to contain 1.01 million barrels of Prospective Resources (P50). The deeper formations would be expected to add to this estimate if they result in discovery.

Oil & Gas Post

Promote Your Page Too