Crude Oil Price by oil-price.net

Oil and Gas Energy News Update

Showing posts with label Parsons. Show all posts
Showing posts with label Parsons. Show all posts

Friday, April 1, 2011

Cooper Confirms Oil Column at Parsons Well

Cooper Confirms Oil Column at Parsons Well

Friday, April 01, 2011

Cooper Energy
Cooper announced that Parsons-4, the second well in the 2011 PEL92 area drilling campaign, was drilled to a total depth of 1,413 meters and wireline logs have confirmed that it has intersected a 5.5 meter oil column in excellent quality Namur sandstone, which is in line with pre-drill expectations.

Preparations are currently underway to case and suspend the well. The well will be tied-back to the Parsons production facilities at a later date and will provide an additional drainage point for the Namur oil reservoir to the south of the Parsons-1 discovery well.

The impact on production rates and reserves will be assessed once the full results of the current Parsons appraisal/development drilling program have been evaluated and production rates from the new development wells have been established.

The next well in the eleven well drilling program is Butlers-2, an appraisal/development well located about 1 km to the northeast of the Butlers-1 discovery well. The details pertaining to Butlers-2 will be announced when the well spuds.

Monday, March 28, 2011

Cooper Spuds Parsons Well

Cooper Spuds Parsons Well

Monday, March 28, 2011
Cooper Energy
 
Cooper announced that the Parsons-4 development well in PPL224 spudded at 10:30 pm on Friday, March 25, 2011. The current operation is cementing the 9⅝” casing at 640 meters.

Parsons-4 is the second appraisal/development well on the Parsons Oil Field in the current drilling program and follows the recently successful Parsons-3 well. Parsons-4 is targeting the Namur oil reservoir to the south of the Parsons-1 discovery well. The well will be drilled to a total depth of 1,412 meters and is expected to take 9 days to drill and complete.