Crude Oil Price by oil-price.net

Oil and Gas Energy News Update

Showing posts with label Mariner. Show all posts
Showing posts with label Mariner. Show all posts

Thursday, September 8, 2011

Statoil On Track with Mariner Project

- Statoil On Track with Mariner Project

The concept chosen for the Mariner heavy oil project on the UK continental shelf includes a production, drilling and quarter (PDQ) platform based on a steel jacket, with a floating storage unit (FSU).

Statoil expects a final investment decision in late 2012 and first oil in late 2016.

The Bressay heavy oil project on the UK continental shelf is also progressing according to plan, one year behind Mariner, to ensure transfer of learning and synergies.

The Mariner and Bressay projects were presented at a press briefing by Statoil's executive vice president for Development and Production International, Peter Mellbye, at SPE Offshore Europe 2011 in Aberdeen.

"After a period of uncertainty, I am proud to be able to say that we are back on track with the landmark Mariner and Bressay developments. To be able to once again move these projects forward is important for Statoil and its partners, as well as for the UK and for the Aberdeen region," said Mellbye.

The ultra-heavy oil projects will require pioneering technology in order to be developed. Since its discovery thirty years ago, the Mariner field has been subject to a number of development studies by different operators.

Statoil is the first company ready to put forward a development concept that will fully address the complexities of this field, in particular related to reservoir management, recovery rates and project execution.

Statoil has extensive heavy oil experience, including the successful development of the Grane field in Norway and the Peregrino field in Brazil.

Because of the low well flow rates and early water break-through there is a need for many wells, artificial lift, and a process designed to handle large liquid rates and oil-water emulsions.

A total of 145 reservoir targets for production or injection are planned for Mariner. While the number of well slots at the platforms is less, this will be solved through use of multi-branch technology, sidetracks and reuse of slots.

The Mariner and Bressay projects will entail a gross investment of roughly GBP 6 billion. Statoil estimates lasting employment of at least 700 individuals, mainly locals, directly involved in its operations, and the establishment of a new operations centre in Aberdeen. The indirect employment of numerous others in the supply and service sectors comes in addition to this.

Oil & Gas Post

Promote Your Page Too
LINK

Tuesday, July 12, 2011

Aker Awarded FEED Study at Statoil's Mariner Field

- Aker Awarded FEED Study at Statoil's Mariner Field

Tuesday, July 12, 2011
Aker Solutions

Aker Solutions has won a contract to conduct the topside FEED (front-end engineering and design) study for Statoil on the Mariner field on the UK continental shelf in the North Sea. The contract value is approximately NOK125 million.

The study will be delivered in the summer of 2012, after which the customer may proceed with the final investment decision.

"We are pleased to have won another important topside FEED study from Statoil. The Mariner field presents an exciting opportunity on the UK shelf, which suits our strategy of boosting our presence in the UK further," said Valborg Lundegaard, executive vice president of Aker Solutions' engineering business.

The engineering and design work will be carried out from Aker Solutions' engineering hub in Oslo, together with engineers from the drilling technologies business in Kristiansand, Norway.

Aker Solutions is also strengthening its UK engineering capacity, hiring experienced engineering professionals to its London office, which could offer future support for the Mariner project.

Oil & Gas Post

Promote Your Page Too
LINK