Crude Oil Price by oil-price.net

Oil and Gas Energy News Update

Showing posts with label Crimson. Show all posts
Showing posts with label Crimson. Show all posts

Monday, July 18, 2011

Crimson Updates Production Activity, Ups 2011 Capital Plans

- Crimson Updates Production Activity, Ups 2011 Capital Plans

Monday, July 18, 2011
Crimson Exploration Inc.

Crimson Exploration Inc. on Monday provided an operational update and announced an increase in its 2011 capital program.

In Liberty County, TX, the Catherine Henderson #B-4 (64.0% WI) commenced production at a gross daily rate of 1,379 Boepd, or 721 barrels of condensate, 208 barrels of natural gas liquids and 3.2 Mmcf of natural gas on a 13/64th choke and 7,000 psi of flowing tubing pressure. This well was drilled to a total measured depth of 15,338 feet in the Lower Cook Mountain formation. Approximately one mile to the northwest, Crimson has drilled the Catherine Henderson A-10 (66.0% WI), targeting the Cook Mountain formation, to a total measured depth of 13,742 feet. Completion operations are scheduled to begin by the end of July with first production in early August.

In Zavala County, TX, Crimson completed the KM Ranch #1H (50.0% WI), targeting the Eagle Ford Shale, and has commenced flow-back operations with results expected in mid-August. The well was drilled to a total measured depth of 12,627 feet, including a 5,800 foot lateral and 20 stages of fracture stimulation. The KM Ranch #1H represents Crimson’s first well in Zavala County where Crimson has an estimated 147 drilling locations and approximately 2,300 net acres held by production. Crimson anticipates spudding the KM Ranch #2H (50.0% WI) in the beginning of November subsequent to spudding its first well in the Booth-Tortuga Area, approximately 13 miles to the southwest of the KM #1H, in the beginning of October.

In Karnes County, Texas, Crimson spud the Littlepage McBride #2H (53.0% WI), targeting the Eagle Ford Shale formation, which is drilling at 8,480 feet toward an estimated total measured depth of 15,850 feet. Completion operations are expected to begin mid-third quarter with initial production to follow in September. The Littlepage McBride #2H is located approximately 0.6 miles to the east of the Littlepage McBride #1H well (53.0% WI) which is currently producing 525 Boepd and has produced a cumulative 53,000 Boe since coming online in early April. Due to the success experienced in Karnes County, we have planned a continuous drilling program for the remainder of the year, commencing a well per month beginning in August.

Updated 2011 Capital Program

Crimson’s Board of Directors recently approved increasing its 2011 capital budget to $78 million, a 30% increase, to accelerate oil weighted drilling activities in Zavala, Dimmit and Karnes Counties. This decision was made based on Crimson’s extensive portfolio of drill ready oil opportunities and recent success. The increase in capital expenditures marks the beginning of an Eagle Ford development program that represents a strategic shift to oil and liquids rich projects in proven areas. As a result, preliminary internal forecasts indicate Crimson’s production mix will be over 40% crude oil and natural gas liquids by January 2012 and over 50% crude oil and natural gas liquids by the second quarter of 2012.

Second Quarter 2011 Production

Crimson produced approximately 4.4 Bcfe of natural gas equivalents, or an estimated 48,740 Mcfe per day, during the second quarter 2011, compared with 2.7 Bcfe, or 30,084 Mcfe per day, produced during the second quarter of 2010, a 62% increase period over period. The second quarter production results were in line with management’s guidance.

Crimson Exploration is a Houston, TX-based independent energy company engaged in the acquisition, development, exploitation and production of crude oil and natural gas, primarily in the onshore Gulf Coast regions of the United States. The Company owns and operates conventional properties in Texas, Louisiana, Colorado and Mississippi, approximately 12,000 net acres in the Haynesville Shale, Mid-Bossier, and James Lime plays in San Augustine and Sabine counties in East Texas, approximately 6,700 net acres in the Eagle Ford play in South Texas and approximately 11,000 net acres in the Denver Julesburg Basin of Colorado.

Oil & Gas Post

Promote Your Page Too
LINK

Monday, April 11, 2011

Crimson Fires Up Production at Eagle Ford Play

Crimson Fires Up Production at Eagle Ford Play

Monday, April 11, 2011
Crimson Exploration Inc.

Crimson announced the successful completion of the Littlepage McBride #1 (53.0% WI), located in Karnes County, TX and targeting the Eagle Ford Shale, commencing production in the first week of April at a gross daily rate of 876 barrels of oil and 717 Mcf of natural gas on a 14/64th choke with 2,845 psi of flowing tubing pressure. The well was drilled to a total measured depth of 15,885 feet, including a 4,800 foot lateral, and was finalized, from spud to first production, in 70 days. The Littlepage McBride represents Crimson's first well on its 1,250 gross acre position in Karnes County, which is adjacent to other significant drilling and producing activity in the oil window of the Eagle Ford play. The Company intends to follow its restricted rate philosophy, currently being utilized in the East Texas Haynesville play, in its Eagle Ford program and does not anticipate increasing the rate further, although the well performance to date suggests it is capable of much higher rates.

Allan D. Keel, President and Chief Executive Officer, commented, "The successful completion of the Littlepage McBride validates Crimson's position in the oil bearing window of the Eagle Ford Shale in Karnes County. Given this initial success in Karnes County and current crude oil prices, Crimson plans to reallocate additional capital to accelerate drilling activities in Karnes County in 2011 to optimize cash flows and shareholder return on oil weighted opportunities. We have also been fortunate enough to have obtained scheduling commitments from our drilling and completion services providers that will enable us to pursue our drilling plans for all of 2011 without delay risks related to the tight market for those services."

In Liberty County, TX, the Catherine Henderson #A-9 (66.0% WI) commenced production at the end of March at a gross daily rate of 9.6 Mmcfe, or 4.4 Mmcf, 578 barrels of condensate and 286 barrels of natural gas liquids on a 12/64th choke and 7,200 psi of flowing tubing pressure. This well was drilled to a total measured depth of 13,150 feet in the Cook Mountain formation. Crimson is currently drilling below 12,850 feet on the Catherine Henderson B-4 (64.0% WI) toward a total measured depth of 13,500 feet and is scheduled to spud the Catherine Henderson A-10 (66.0% WI) in May.

In our Bruin Prospect Area of San Augustine County, TX, we have successfully completed 14 stages of frac on the Kodiak #1 well (70% WI) in the Mid Bossier Shale and expect initial production to begin within the next two weeks. Completion operations have commenced in the Haynesville Shale formation on the Blue #1 well (70.7% WI), also in the Bruin Prospect Area, with initial production expected around the first of May.

We anticipate spudding the KM Ranch #1 well, our first Eagle Ford well in Zavala County, TX, by the beginning of May. We have approximately 4,675 gross acres (50% WI) in Zavala County that we believe to be prospective in the oil window of the Eagle Ford Shale. This operated well is expected to be drilled to a total measured depth of approximately 12,500 feet, with a projected 5,500 foot lateral.