Crude Oil Price by oil-price.net

Oil and Gas Energy News Update

Monday, August 15, 2011

Petronas to Award Second Deal for Marginal Field Soon

- Petronas to Award Second Deal for Marginal Field Soon

Monday, August 15, 2011
The New Straits Times
by Kamarul Yunus

Petroliam Nasional Bhd (Petronas) is expected to announce the second contract to develop a marginal oil field soon.

"Petronas is currently finalizing the second risk services contract (RSC) and will make an announcement in due time," a Petronas spokesman told Business Times.

The spokesman, however, did not identify the field.

In January this year, Petronas said it will award two marginal oil field contracts by April. The only RSC awarded so far is for the Berantai field to the Petrofac-Kencana Petroleum-SapuraCrest Petroleum partnership early this year.

But in its prospectus for listing on Bursa Malaysia last month, Bumi Armada Bhd said it was awarded a floating, storage and offload (FSO) vessel contract for the Sepat field. It is claimed to be the first under the marginal fields initiative of the government's Economic Transformation Program (ETP).

Responding to Business Times' query, the spokesman clarified that Sepat is a field currently being developed under a production sharing contract operated by Petronas Carigali Sdn Bhd, the exploration and production arm of the national oil company.

In December last year, Petronas Carigali awarded the engineering, procurement, construction, installation and commissioning contract for Sepat to Petrofac, which in turn awarded the FSO vessel contract to Bumi Armada.

The development of the marginal oil and gas fields under the new RSC arrangement is part of the initiatives under the ETP.

Malaysia, according to Petronas, has 106 marginal fields, with 580 million barrels of oil.

(C) 2011 The New Straits Times. via ProQuest Information and Learning Company; All Rights Reserved

Oil & Gas Post

Promote Your Page Too
LINK

Nostra Terra Reaches Total Vertical Depth at Verde Prospect

- Nostra Terra Reaches Total Vertical Depth at Verde Prospect

Monday, August 15, 2011
Nostra Terra O&G Co. plc

Nostra Terra announced that the initial well in the Verde Prospect in south-eastern Colorado, has been drilled ahead of schedule to a total vertical depth of 5,300 feet.

Indications of productivity in drilling samples and electric logs were positive and the well has been recommended for completion.

Production casing will be run to total depth, followed by completion in the most optimal zone(s). NTOG will provide the first 30-day production figures as soon as these are available.

NTOG has a 16.25% working interest (WI) in the Verde prospect. Following evaluation of testing and potential production of the initial well, two or three further development wells (PUDs) could be drilled, in which Nostra Terra also has the right to participate.

Matt Lofgran, Chief Executive Officer of Nostra Terra, commented, "We're pleased with the progress made on this well ahead of schedule and hope to see further positive results on this prospect. As a company, our current prospects are fully-funded, with additional cash on hand for further acquisitions, allowing us to continue to grow, regardless of the state of the global economy or markets."

Oil & Gas Post

Promote Your Page Too
LINK

Caza Spotlights Operational, Financial Results for 2Q11

- Caza Spotlights Operational, Financial Results for 2Q11

Monday, August 15, 2011
Caza O&G Inc.

Caza O&G provided its unaudited financial and operational results for the six months ended June 30, 2011.

Second Quarter Financial Highlights
  • Caza's production increased 32% to 18,130 Boe for the three-month period ended June 30, 2011, from 13,712 Boe for the comparative period in 2010. This represents an average daily production rate increase of 48 Boe/d for the three month period ended June 30, 2011, 199 Boe/d as compared to 151 Boe/d for the comparative period. As anticipated, Q2 2011 production was slightly lower than Q1 2011 (which was 23,974 Boe) due to standard production curve declines in certain wells. Recently drilled wells that are in various stages of completion are expected to more than make up for the decline (see "Second Quarter Operational Highlights" below).
  • Caza had a cash balance of $24,533,451 as of June 30, 2011, as compared to $9,375,345 at June 30, 2010 and $33,885,900 at December 31, 2010. The increase is attributable to the placing announced on Nov 15 2010. Caza's working capital balance at June 30, 2011, was $20,870,708 as compared to $26,612,514 at March 31, 2011. The decrease in Caza's working capital balance primarily represents the investments made to drill the O.B. Ranch #2 development well in Wharton County, Texas, the Caza Elkins 3401 & 3402 wells in Midland County, Texas, and the Caza 158 #3 in Upton County, Texas.
  • Revenues from oil and gas sales increased 112% to $843,836 for the three-month period ended June 30, 2011, up from $398,883 for the comparative period in 2010. The increase in revenues was primarily due to the additional wells brought on since the comparative period. The average combined price received by Caza increased 60% to $46.54 per Boe during the three-month period ended June 30, 2011, from $29.09 per Boe during the comparative period in 2010.
  • General and Administrative expenses were $1,435,156 ($1,403,088 net of reimbursements) for the three-month period ended June 30, 2011, as compared to $1,188,962 ($1,078,739 net of reimbursements) for the comparative period in 2010. The change in General and Administrative costs are a result of additional costs incurred and changes in reporting requirements as a result of converting to the International Financial Reporting Standards. During the three month period ended June 30, 2010, the Company received reimbursements that resulted from certain joint venture agreements that provided reductions in overhead costs that expired April 8, 2010.

Second Quarter Operational Highlights
  • Drilling commenced on the O.B. Ranch #2 development well in Wharton County, Texas in May 2011. The well reached its target depth of 13,210 feet in June 2011, and electric logs were obtained through the target depth indicating potential pay in the Frio and targeted Cook Mountain formations. The well was fracture stimulated at the end of July 2011, and is currently being flowed back in order to clean up the fracture fluids. The well has been placed on an extended well test, and the market will be updated once stabilized flow rates have been achieved.
  • The Caza Elkins 3401 well in Midland County, Texas, reached a total depth of 11,854 feet in June 2011. The rig was immediately moved to the Caza Elkins 3402 location, which reached a total depth of 11,852 feet in July 2011. Log data from both wells indicated multiple potential pay sands for both oil and gas in the Spraberry, Wolfcamp, Strawn, Atoka and Mississippian/Devonian formations. The fracture stimulation program for the Caza Elkins 3401 well began on July 28, 2011. The fracture stimulation program for the Caza Elkins 3402 well began earlier than anticipated on August 12, 2011. Both wells are currently being flowed back in order to clean up the fracture fluids. Caza will update the market once initial flow rates have been established for each well.
  • The Caza 158 #3 well on the Windham property reached its target depth of 9,824 feet in June 2011, and Caza elected to participate in the operator's proposal to complete the well. The well has been fracture stimulated across all potentially productive intervals seen on the logs, which include the Spraberry/Wolfcamp, Penn and Strawn formations. The Caza 158 #3 was the fourth well drilled and completed on this property. The Caza 158 #1, 158 #2 and 162 #1 wells are currently at various stages in their respective fracture stimulation programs, but are all producing oil and natural gas.

W. Michael Ford, Chief Executive Officer commented, "I am very pleased with the progress that we have made in 2011, both operationally and from a financial perspective. In the three months to June 30, 2011, Caza has continued to progress a busy work program, which should add further production, reserves and cash flow to the solid platform that we have created through our endeavors to date.

"Revenues have materially risen due to increased oil and gas production levels and a supportive price environment. As we add production through our exploration and development campaign, the Company and the shareholders should continue to benefit.

"I look forward to updating the market on future exploration activities and established flow rates associated with wells that are currently in various stages of completion operations."

Oil & Gas Post

Promote Your Page Too
LINK

Rockhopper Boosts Estimates at Sea Lion Play

- Rockhopper Boosts Estimates at Sea Lion Play

Monday, August 15, 2011
Rockhopper Exploration plc

Rockhopper provided the following update on the interpretation of the fast track seismic data over acreage on licenses PL032 and PL033:
  • Initial interpretation of fast track new seismic data in PL032 and PL033 completed
  • Seismic shows Sea Lion Main Complex ("SLMC") to extend to the south and new high case area to extend over 90km2
  • Two new fan prospects identified within new seismic, Casper and Kermit
  • Management interpretation for SLMC potential size: 
    • Low Case: 608 MMbbls STOIIP
    • Mid Case: 1,086 MMbbls STOIIP
    • High Case: 1,279 MMbbls STOIIP

Volumes listed above are within Rockhopper's 100% owned acreage. Not included in the high case listed above, based upon the current interpretation, the Company believes that up to approximately 10% additional volume could be contained within license PL004, in which Rockhopper has a non-operated 7.5% working interest.

During 2011 the Company acquired a total of over 4000km2 of 3D seismic data in conjunction with other operators in the area. Data over the southern portion of licenses PL032 and PL033 has been fast track processed and an initial interpretation has now been completed. This initial interpretation, combined with well data from 14/10-2, 14/10-3, 14/10-4, 14/10-5 and 14/10-6, indicates that the SLMC comprises two fan lobes sourced from the same main feeder channel just to the east of the 14/10-5 and 14/10-2 wells.

The two lobes, represented as sand packages within the wells, are identified as the SL20 and SL10 units, and, from the formation pressure data acquired in the wells, are shown to be in pressure communication. The two packages together comprise the SLMC and are interpreted to comprise of mass flow turbidite sand sequences prograding from the sand input point to the east and extending beyond the southern boundary of license PL032 into license PL004, where Rockhopper has a non-operated 7.5% working interest.

The Company believes that recovery rates of 30% to 40% could be achievable using industry standard production techniques including water injection, artificial lift, deviated or horizontal wells and /or other enhanced oil recovery techniques.

Should a recovery factor of 30% be achieved, based upon the Company's mid case area, the SLMC would contain approximately 325mmbbls recoverable oil. Should a recovery factor of 40% be achieved, the mid case number would increase to 434mmbbls recoverable oil.

The fast track seismic interpretation has enabled the identification of two new feeders into the basin and the mapping of two new prospects, Casper and Kermit. Both of these comprise similar fan systems fed from eastern basin margin feeder channels and exhibit similar seismic character to the SLMC. Casper is stratigraphically shallower than the SLMC while Kermit is stratigraphically deeper than the SLMC.

Following well 14/10-6 the Company believes that the B15 sand, which forms part of the lower fan complex, has the potential to contain up to 161 mmbbls STOIIP on a high case basis. Formation pressure testing indicates that B15 is also in communication with the SLMC.

Fan prospects currently mapped on the Company's acreage are now SLMC, Lower Fan (B sands), Chatham, Casper and Kermit.

In addition to the SLMC, management interpretation of potential in place resources across the other fan prospects within the licence is set out below (All mmbbls STOIIP):

Low Mid High
Lower Fan (B15) 100 130 161
Casper 135 163 194
Kermit 39 47 55
Chatham 28 93 318

The balance of the newly acquired 3D seismic data is still being processed and the Company expects it will be available for interpretation before the end of 2011.

Future Drilling Plans

Following completion of drilling operations on well 14/10-6, the Company is currently committed to drill three further wells using the Ocean Guardian drilling unit. The Company is discussing the possibility of drilling additional wells under an assignment agreement.

The Company intends to drill the next well 3.3km north west of the 14/10-2 discovery well. The second well in the sequence is currently planned to be located approximately 4.1 km to the south south east of the 14/10-2 discovery well. The third well in the sequence is currently planned to be located approximately 5.5km south west of the 14/10-2 discovery well. The second and third locations are subject to change depending upon drilling results and technical work and are subject to gaining the relevant regulatory consents. The Company currently intends to wait for the result of well 14/10-7 before deciding whether to take any additional drilling slots. Estimates of in place and prospective resource information are based upon wells drilled to date and could alter with future well results. Once the Company completes its current drilling campaign, all estimated potential in place resource estimates will be further refined.

Operations continue at the 14/10-6 location and a further announcement will be made once 14/10-7 has been spudded.

Sam Moody, Chief Executive, commented, "We are highly encouraged by the interpretation of new seismic data which identifies both significant reservoir extension and the existence of two additional fan prospects above and beneath the Sea Lion Main Complex. We look forward to continuing our drilling program as we seek to further refine our understanding of Sea Lion and the other prospects on our licenses."

Oil & Gas Post

Promote Your Page Too
LINK